OPM Chapter 4

BNL:  Departments  |  Science  |  ESSHQ  |  Newsroom  |  Administration  |  Visitors  |  Directory

 

Accelerator
ATS
Authorization
BNL Site Index
BTMS
Committees
Controls
Design Safety
Elec. Safety
EMS
ESF
ESH Phone
ESHQ SMD
ESSHQ C-AD
Home
LESHC
Operations
OPM
OSH
PPE
Rad. Safety
Safety
SBMS
Search OPM
Search Site
Site Map
Training

 

Official copies of these procedures are maintained at this website.    Before using a printed copy, verify that it is the most current  version by checking the document issue date on this website.  Signed copies of these official procedures are maintained at the Training Office. 

 

Return to Table of Contents

 

Procedure No.

Procedure Title

Author

Revision No.

Date

4.1

C-A Complex Access Control Procedures for Primary Beam Enclosures

Peter Ingrassia

10

05/01/08

4.1.a

C-A Gate Security Log Sheet Form

Peter Ingrassia

02

07/20/06

4.1.b

Primary Beam Accessibility Matrix

Peter Ingrassia

02

07/20/06

4.1.c

Keys Required to Access Primary Beam Enclosures and High Radiation Areas

Peter Ingrassia

03

08/08/07

4.1.d

Injector Access Control Flow Chart

Peter Ingrassia

03

07/20/06

4.1.e

Electrical Safety Training Requirements for Ring Entry

Peter Ingrassia

03

08/07/07

4.1.f

C-A Gate Security Log Sheet for Remote Access

Peter Ingrassia

05

07/20/06

4.1.g

C-A Electronic Gate Security Log Sheet for Remote Access

Peter Ingrassia

01

08/10/07

4.1.2

C-AD ACS/PASS Orange Tag Procedure

Jonathan Reich

01

11/03/05

4.2

Procedure for AGS Access During Cooldown and Operation of the A20 Cold Snake

Peter Ingrassia

00

11/30/06

4.7

Secondary Beam Line Sweep, Access and Clearance Procedures

Frederick Kobasiuk

02

12/20/06

4.30

Operating Directive for Resetting a Primary Area Gate on Which One Reset Circuit has "Dropped Out"

Peter Ingrassia

03

06/05/08

4.31

Procedure for Setting the Access Control System Alternate Critical Devices

Peter Ingrassia

05

02/24/06

4.32

Use of Access Control System (ACS) Beam Stop Failure Reset Panel

Peter Ingrassia

02

07/20/06

4.39

Procedure for Operation of Booster Access Control System

Jonathan Reich

03

05/07/08

4.44

Operation of PASS

Peter Ingrassia

10

04/11/08

4.44.1

Procedures for Reloading Processor Memory from an EEPROM after Processor Memory Corruption

Jonathan Reich

02

07/19/06

4.44.2

Procedures for Downloading a PASS PLC Program into EEPROM Memory Module and Uploading the Program to RAM

Jonathan Reich

02

07/19/06

4.44.3

Procedures for Reloading a PASS SLC Program from an EEPROM after Processor Memory Corruption

Jonathan Reich

02

07/19/06

4.44.4

Procedures for Downloading a PASS SLC Program into an EEPROM Memory Module and Uploading the Program to RAM

Jonathan Reich

04

02/22/07

4.44.5

Procedure to Test AGS PASS Operation After Software Download

Jonathan Reich

03

04/16/07

4.44.6

PASS Maintenance Procedure: Calibration of Current Source Board (Group Proc. No. 101-A)

Dean McDonald

00

06/03/07

4.46

Procedure for Accessing the C-A Radiological Areas and Berms: AGS Ring Fan Houses (A,B,C,D and E), Northwest Corner of the  Target Building, TANDEM/AGS ALCOVE, the Booster Berm, the U-W (AtR) Berm, NSRL Berm, and the RHIC Berm During Accelerator Operation

Peter Ingrassia

05

12/18/07

4.47

AGS Access During HEBT Operation

Peter Ingrassia

01

04/12/07

4.49

Procedure for Generating and Using CAS Sweep, Clearance and Access Procedures for Non-Primary Beam Enclosures

William Anderson

02

09/13/06

4.56

Procedure for Sweeping Primary Beam Enclosures - Controlled Access

Peter Ingrassia

03

02/06/07

4.56.a

AGS  Ring Sweep Checklist

Peter Ingrassia

05

02/10/06

4.56.b

AGS Cursory Sweep Checklist

Peter Ingrassia

02

01/13/05

4.56.c

AGS Fanhouse (A, B, C, D and E) Sweep Checklist

Peter Ingrassia

03

04/22/08

4.56.d

Northwest Corner of the Target Building Sweep Checklist

Peter Ingrassia

03

04/22/08

4.56.e

Tandem To AGS Alcove Sweep Checklist

Peter Ingrassia

02

04/07/05

4.56.f

Booster Sweep Checklist

Peter Ingrassia

04

07/20/06

4.56.g

Booster Berm Sweep Checklist

Peter Ingrassia

04

09/22/06

4.56.h

Building 914 Roof Sweep Checklist

Peter Ingrassia

02

04/07/05

4.56.i

Linac Sweep Checklist

Peter Ingrassia

03

01/27/06

4.56.j

Tandem to Booster (HEBT/TTB) Crossover Sweep Checklist

Peter Ingrassia

03

08/10/07

4.56.k

SEB "A" Target Primary Cave Sweep Checklist

Peter Ingrassia

05

05/05/08

4.56.l

SEB "A3" Primary Cave Sweep Checklist

Peter Ingrassia

02

06/09/05

4.56.m

SEB "A2" Primary Cave Sweep Checklist

Peter Ingrassia

03

04/07/05

4.56.n

SEB "B" Target Primary Cave Sweep Checklist

Peter Ingrassia

03

04/07/05

4.56.o

SEB "B2" Primary Cave Sweep Checklist

Peter Ingrassia

02

04/07/05

4.56.p

SEB "C" Target Primary Cave Sweep Checklist

Peter Ingrassia

02

04/07/05

4.56.s

SEB C3 Target Primary Cave Sweep Checklist

Peter Ingrassia

02

02/07/05

4.56.t

SEB "D" Target Primary Cave Sweep Checklist

Peter Ingrassia

02

04/07/05

4.56.u

SEB "D6" Separator 1 Primary Cave Sweep Checklist

Peter Ingrassia

02

04/07/05

4.56.v

SEB "D6" Separator 2 Primary Cave Sweep Checklist

Peter Ingrassia

02

04/07/05

4.56.w

SEB Switchyard Sweep Checklist

Peter Ingrassia

04

05/05/08

4.56.x

U Upstream Sweep Checklist

Peter Ingrassia

03

05/05/08

4.56.y

U-Line Berm Sweep Checklist

Paul Sampson

05

05/05/08

4.56.z

V Target Station Sweep Checklist

Peter Ingrassia

03

03/14/07

4.56.aa

V1 Blockhouse Sweep Checklist

Peter Ingrassia

03

03/14/07

4.56.ab

V1 Primary Sweep Checklist

Peter Ingrassia

02

04/07/05

4.56.ac

V1D6 Pit Sweep Checklist

Peter Ingrassia

02

04/07/05

4.56.ad

6 Muon Storage Ring Sweep Checklist

Peter Ingrassia

02

04/07/05

4.56.ae

U-Downstream Sweep Checklist

Peter Ingrassia

03

05/05/08

4.56.af

RHIC Zone 12z1 Sweep Checklist

Peter Ingrassia & Waldo Mackay

03

05/16/08

4.56.ag

RHIC Zone 12z2 Sweep Checklist

Peter Ingrassia & Waldo Mackay

03

05/21/08

4.56.ah

RHIC Zone 1z1 Sweep Checklist

Peter Ingrassia

02

05/03/05

4.56.ai

RHIC Zone 2Z1 Sweep Checklist

Peter Ingrassia

02

05/03/05

4.56.aj

RHIC Zone 2z2 Sweep Checklist

Peter Ingrassia

02

07/20/06

4.56.akl

RHIC Zone 4z1 Sweep Checklist

Peter Ingrassia

04

06/02/08

4.56.am

RHIC Zone 4z2 Sweep Checklist

Peter Ingrassia

02

03/02/05

4.56.an

RHIC Zone 5z1 Sweep Checklist

Peter Ingrassia

02

07/20/06

4.56.ao

RHIC Zone 6z1/STAR Sweep Checklist

Peter Ingrassia

03

01/05/07

4.56.ap

RHIC Zone 6z2 Sweep Checklist

Peter Ingrassia

02

07/20/06

4.56.aq

RHIC Zone 7z1 Sweep Checklist

Peter Ingrassia / Waldo MacKay

04

02/17/06

4.56.ar

RHIC 8z1 Sweep Checklist

Peter Ingrassia

02

01/05/07

4.56.as

RHIC Zone 8z2 Sweep Checklist

Peter Ingrassia

03

02/17/06

4.56.at

RHIC Zone 9z1 Sweep Checklist

Peter Ingrassia

02

07/20/06

4.56.au

RHIC Zone 10z1 Sweep Checklist

Peter Ingrassia

02

05/03/05

4.56.av

RHIC Zone 10z2 Sweep Checklist

Peter Ingrassia

02

05/03/05

4.56.aw

RHIC Zone 11z1 Sweep Checklist

Peter Ingrassia & Waldo Mackay

03

05/21/08

4.56.ax

X Line Sweep Checklist

Peter Ingrassia & Waldo Mackay

03

05/06/08

4.56.ay

Y Line Sweep Checklist

Peter Ingrassia  & Waldo Mackay

03

05/07/08

4.56.az

W Line Sweep Checklist

Peter Ingrassia & Waldo Mackay

04

05/07/08

4.56.bb

NSRL Stub Tunnel (Z3) Sweep Checklist

Peter Ingrassia

03

12/01/06

4.56.bc

NSRL Transport Tunnel (Z2) Sweep Checklist

Peter Ingrassia

04

09/20/06

4.56.bd

NSRL Experimental Area (Z1) Sweep Checklist

Peter Ingrassia

04

07/20/06

4.56.be

NSRL Berm Sweep Checklist

Paul Sampson

02

09/28/06

4.56.bf

Building 939 Experimental Hall Sweep Checklist

Peter Ingrassia

00

04/12/07

4.56.bg

Building 939 East & West Tunnel Sweep Checklist

Peter Ingrassia

00

04/12/07

4.57

Operating Booster Shield Door in Bldg. 914

Peter Ingrassia

03

01/10/07

4.60

Procedure for Access to Beamstop/BLIP Pump Room (Bldg. 946)

Edward Lessard

03

01/22/08

4.60.a

Linac Posting

Brian Briscoe

02

06/23/06

4.61

Procedure for NMC Commissioning and Checking Integrating NMC Monitors

Vincent Castillo

03

02/22/07

4.61.a

NMC Recheck Sheet

David Gassner

02

09/11/06

4.62