Official copies of these procedures are maintained at this website.
Before using a printed copy, verify that it is the most current
version by checking the document issue date on this website.
Signed copies of these official procedures are maintained at the
Training Office.
Return to Table of Contents
Procedure No.
|
Procedure Title
|
Author
|
Revision No.
|
Date
|
|
4.1
|
C-A Complex Access Control Procedures for Primary
Beam Enclosures
|
Peter Ingrassia
|
10
|
05/01/08
|
|
4.1.a
|
C-A Gate Security Log Sheet Form
|
Peter Ingrassia
|
02
|
07/20/06
|
|
4.1.b
|
Primary Beam Accessibility Matrix
|
Peter Ingrassia
|
02
|
07/20/06
|
|
4.1.c
|
Keys Required to Access Primary Beam Enclosures
and High Radiation Areas
|
Peter Ingrassia
|
03
|
08/08/07
|
|
4.1.d
|
Injector
Access Control Flow Chart
|
Peter Ingrassia
|
03
|
07/20/06
|
|
4.1.e
|
Electrical Safety Training Requirements for Ring
Entry
|
Peter Ingrassia
|
03
|
08/07/07
|
|
4.1.f
|
C-A Gate Security Log Sheet for Remote Access
|
Peter Ingrassia |
05
|
07/20/06
|
|
4.1.g |
C-A Electronic Gate Security Log Sheet for Remote Access |
Peter Ingrassia |
01 |
08/10/07 |
|
4.1.2 |
C-AD ACS/PASS Orange Tag Procedure |
Jonathan Reich |
01 |
11/03/05 |
|
4.2 |
Procedure
for AGS Access During Cooldown and Operation of the A20 Cold Snake |
Peter Ingrassia |
00 |
11/30/06 |
|
4.7
|
Secondary Beam Line Sweep, Access and Clearance
Procedures
|
Frederick Kobasiuk
|
02
|
12/20/06
|
|
4.30
|
Operating Directive for Resetting a Primary Area
Gate on Which One Reset Circuit has "Dropped Out"
|
Peter Ingrassia
|
03
|
06/05/08
|
|
4.31
|
Procedure for Setting the Access Control System
Alternate Critical Devices
|
Peter Ingrassia
|
05
|
02/24/06
|
|
4.32
|
Use of Access Control System (ACS) Beam Stop
Failure Reset Panel
|
Peter Ingrassia
|
02
|
07/20/06
|
|
4.39
|
Procedure for
Operation of Booster Access Control System
|
Jonathan Reich
|
03
|
05/07/08
|
|
4.44
|
Operation of PASS
|
Peter Ingrassia
|
10
|
04/11/08
|
|
4.44.1
|
Procedures for Reloading Processor Memory from an
EEPROM after Processor Memory Corruption
|
Jonathan Reich
|
02
|
07/19/06
|
|
4.44.2
|
Procedures for Downloading a PASS PLC Program into
EEPROM Memory Module and Uploading the Program to RAM
|
Jonathan Reich
|
02 |
07/19/06
|
|
4.44.3
|
Procedures for Reloading a PASS SLC Program from
an EEPROM after Processor Memory Corruption
|
Jonathan Reich
|
02
|
07/19/06
|
|
4.44.4
|
Procedures for Downloading a PASS SLC Program into an EEPROM
Memory Module and Uploading the Program to RAM
|
Jonathan Reich
|
04
|
02/22/07
|
|
4.44.5
|
Procedure to Test AGS PASS Operation After
Software Download
|
Jonathan Reich
|
03
|
04/16/07
|
|
4.44.6
|
PASS
Maintenance Procedure: Calibration of Current Source Board (Group Proc.
No. 101-A)
|
Dean McDonald
|
00
|
06/03/07
|
|
4.46
|
Procedure for Accessing the C-A Radiological Areas
and Berms: AGS Ring Fan Houses (A,B,C,D and E), Northwest Corner of the
Target Building, TANDEM/AGS ALCOVE, the Booster Berm, the U-W (AtR)
Berm, NSRL Berm, and the RHIC Berm During Accelerator Operation
|
Peter Ingrassia
|
05
|
12/18/07
|
|
4.47
|
AGS Access During HEBT Operation
|
Peter Ingrassia
|
01
|
04/12/07
|
|
4.49
|
Procedure for
Generating and Using CAS Sweep, Clearance and Access Procedures for
Non-Primary Beam Enclosures
|
William Anderson
|
02
|
09/13/06
|
|
4.56
|
Procedure for Sweeping Primary Beam Enclosures -
Controlled Access
|
Peter Ingrassia
|
03
|
02/06/07
|
|
4.56.a
|
AGS Ring Sweep Checklist
|
Peter Ingrassia
|
05
|
02/10/06
|
|
4.56.b
|
AGS Cursory Sweep Checklist
|
Peter Ingrassia
|
02
|
01/13/05
|
|
4.56.c
|
AGS Fanhouse (A, B, C, D and E) Sweep Checklist
|
Peter Ingrassia
|
03
|
04/22/08
|
|
4.56.d
|
Northwest Corner of the Target Building Sweep
Checklist
|
Peter Ingrassia
|
03
|
04/22/08
|
|
4.56.e
|
Tandem To AGS Alcove Sweep Checklist
|
Peter Ingrassia
|
02
|
04/07/05
|
|
4.56.f
|
Booster Sweep Checklist
|
Peter Ingrassia
|
04
|
07/20/06
|
|
4.56.g
|
Booster Berm Sweep Checklist
|
Peter Ingrassia
|
04
|
09/22/06
|
|
4.56.h
|
Building 914 Roof Sweep Checklist
|
Peter Ingrassia
|
02
|
04/07/05
|
|
4.56.i
|
Linac Sweep Checklist
|
Peter Ingrassia
|
03
|
01/27/06
|
|
4.56.j
|
Tandem to Booster (HEBT/TTB) Crossover Sweep
Checklist
|
Peter Ingrassia
|
03
|
08/10/07
|
|
4.56.k
|
SEB "A" Target Primary Cave Sweep Checklist
|
Peter Ingrassia
|
05
|
05/05/08
|
|
4.56.l
|
SEB "A3" Primary Cave Sweep Checklist
|
Peter Ingrassia
|
02
|
06/09/05
|
|
4.56.m
|
SEB "A2" Primary Cave Sweep Checklist
|
Peter Ingrassia
|
03
|
04/07/05
|
|
4.56.n
|
SEB "B" Target Primary Cave Sweep Checklist
|
Peter Ingrassia
|
03
|
04/07/05
|
|
4.56.o
|
SEB "B2" Primary Cave Sweep Checklist
|
Peter Ingrassia
|
02
|
04/07/05
|
|
4.56.p
|
SEB "C" Target Primary Cave Sweep Checklist
|
Peter Ingrassia
|
02
|
04/07/05
|
|
4.56.s |
SEB C3 Target Primary Cave Sweep Checklist |
Peter Ingrassia
|
02 |
02/07/05 |
|
4.56.t
|
SEB "D" Target Primary Cave Sweep Checklist
|
Peter Ingrassia
|
02
|
04/07/05
|
|
4.56.u
|
SEB "D6" Separator 1 Primary Cave Sweep Checklist
|
Peter Ingrassia
|
02
|
04/07/05
|
|
4.56.v
|
SEB "D6" Separator 2 Primary Cave Sweep Checklist
|
Peter Ingrassia
|
02
|
04/07/05
|
|
4.56.w
|
SEB Switchyard Sweep Checklist
|
Peter Ingrassia
|
04
|
05/05/08 |
|
4.56.x
|
U Upstream Sweep
Checklist
|
Peter Ingrassia
|
03
|
05/05/08
|
|
4.56.y
|
U-Line Berm Sweep Checklist
|
Paul Sampson
|
05
|
05/05/08
|
|
4.56.z
|
V Target Station Sweep Checklist
|
Peter Ingrassia
|
03
|
03/14/07
|
|
4.56.aa
|
V1 Blockhouse Sweep Checklist
|
Peter Ingrassia
|
03
|
03/14/07
|
|
4.56.ab
|
V1 Primary Sweep Checklist
|
Peter Ingrassia
|
02
|
04/07/05
|
|
4.56.ac
|
V1D6 Pit Sweep Checklist
|
Peter Ingrassia
|
02
|
04/07/05
|
|
4.56.ad
|
6 Muon Storage Ring Sweep Checklist
|
Peter Ingrassia
|
02
|
04/07/05
|
|
4.56.ae
|
U-Downstream Sweep Checklist
|
Peter Ingrassia
|
03
|
05/05/08
|
|
4.56.af
|
RHIC Zone 12z1 Sweep Checklist
|
Peter Ingrassia
& Waldo Mackay
|
03
|
05/16/08
|
|
4.56.ag
|
RHIC Zone 12z2 Sweep Checklist
|
Peter Ingrassia
& Waldo Mackay
|
03
|
05/21/08
|
|
4.56.ah
|
RHIC Zone 1z1 Sweep Checklist
|
Peter Ingrassia
|
02
|
05/03/05
|
|
4.56.ai
|
RHIC Zone 2Z1 Sweep Checklist
|
Peter Ingrassia
|
02
|
05/03/05
|
|
4.56.aj
|
RHIC Zone 2z2 Sweep Checklist
|
Peter Ingrassia
|
02
|
07/20/06
|
|
4.56.akl
|
RHIC Zone 4z1 Sweep Checklist
|
Peter Ingrassia
|
04
|
06/02/08 |
|
4.56.am
|
RHIC Zone 4z2 Sweep Checklist
|
Peter Ingrassia
|
02
|
03/02/05
|
|
4.56.an
|
RHIC Zone 5z1 Sweep Checklist
|
Peter Ingrassia
|
02
|
07/20/06
|
|
4.56.ao
|
RHIC Zone 6z1/STAR Sweep Checklist
|
Peter Ingrassia
|
03
|
01/05/07
|
|
4.56.ap
|
RHIC Zone 6z2 Sweep Checklist
|
Peter Ingrassia
|
02
|
07/20/06
|
|
4.56.aq
|
RHIC Zone 7z1 Sweep Checklist
|
Peter Ingrassia
/ Waldo MacKay
|
04
|
02/17/06
|
|
4.56.ar
|
RHIC 8z1 Sweep Checklist
|
Peter Ingrassia
|
02
|
01/05/07
|
|
4.56.as
|
RHIC Zone 8z2 Sweep Checklist
|
Peter Ingrassia
|
03
|
02/17/06
|
|
4.56.at
|
RHIC Zone 9z1 Sweep Checklist
|
Peter Ingrassia
|
02
|
07/20/06
|
|
4.56.au
|
RHIC Zone 10z1 Sweep Checklist
|
Peter Ingrassia
|
02
|
05/03/05
|
|
4.56.av
|
RHIC Zone 10z2 Sweep Checklist
|
Peter Ingrassia
|
02
|
05/03/05
|
|
4.56.aw
|
RHIC Zone 11z1 Sweep Checklist
|
Peter Ingrassia
& Waldo Mackay
|
03
|
05/21/08
|
|
4.56.ax
|
X Line Sweep Checklist
|
Peter Ingrassia
& Waldo Mackay
|
03
|
05/06/08
|
|
4.56.ay
|
Y Line Sweep Checklist
|
Peter Ingrassia
& Waldo Mackay
|
03
|
05/07/08
|
|
4.56.az
|
W Line Sweep Checklist
|
Peter Ingrassia &
Waldo Mackay
|
04
|
05/07/08
|
|
4.56.bb
|
NSRL Stub Tunnel (Z3) Sweep Checklist
|
Peter Ingrassia
|
03
|
12/01/06
|
|
4.56.bc
|
NSRL Transport Tunnel (Z2) Sweep Checklist
|
Peter Ingrassia
|
04
|
09/20/06
|
|
4.56.bd
|
NSRL Experimental Area (Z1) Sweep Checklist
|
Peter Ingrassia
|
04
|
07/20/06
|
|
4.56.be
|
NSRL Berm Sweep Checklist
|
Paul Sampson
|
02
|
09/28/06
|
|
4.56.bf
|
Building 939 Experimental Hall Sweep Checklist
|
Peter Ingrassia
|
00
|
04/12/07 |
|
4.56.bg
|
Building 939 East & West Tunnel Sweep Checklist
|
Peter Ingrassia
|
00
|
04/12/07 |
|
4.57
|
Operating Booster Shield Door in Bldg. 914
|
Peter Ingrassia
|
03
|
01/10/07
|
|
4.60
|
Procedure for Access to Beamstop/BLIP Pump Room
(Bldg. 946)
|
Edward Lessard
|
03
|
01/22/08
|
|
4.60.a
|
Linac Posting
|
Brian Briscoe
|
02
|
06/23/06
|
|
4.61
|
Procedure for NMC Commissioning and Checking
Integrating NMC Monitors
|
Vincent Castillo
|
03
|
02/22/07
|
|
4.61.a
|
NMC Recheck Sheet
|
David Gassner
|
02
|
09/11/06
|
|
4.62
|
|