                          RHIC RETREAT 2000
                       Thu Nov 16 / Fri Nov 17
       Third floor, Student Activities Center, SUNY/StonyBrook
             Organizer: Todd Satogata (satogata@bnl.gov)

                   ~ Directions are now available ~
======================================================================
THURSDAY NOVEMBER 16 2000

 8:00	LIGHT BREAKFAST
 8:30   PLENARY - PRELIMINARY DISCUSSION              SATOGATA    302
   10      Retreat Organization                       Satogata
   20      Overview: Setting The Stage (PowerPoint)   Roser
   20      Power Supplies and Ramping                 Ganetis
   20      High Frequency/RF (MS Doc)                 Brennan
   20      AP Studies/Issues                          Pilat

10:00   COFFEE
10:30   PARALLEL SESSIONS (Open discussions room 305)

        ACCELERATOR PHYSICS/HIGH FREQUENCY            PILAT       302
   10   Optics measurements/ AC dipole                Bai
   10   Luminosity/ Vernier scans       	      Drees
   10   Collimation (Postscript)            	      Fliller
   15   Linear IR correction                          Ptitsyn
   15   Nonlinear IR correction         	      Pilat

        POWER SUPPLIES AND RAMPING                    GANETIS     303
   20   New power supplies for next run               Sandberg
   20   Hardware reliability                          Schultheiss
   20   Planned improvements during shutdown          Ganetis
   20   Controls Issues                               Clifford
   10   Session Discussions                           Ganetis

12:00   LUNCH
 1:30   PARALLEL SESSIONS - CONTINUED

        ACCELERATOR PHYSICS/HIGH FREQUENCY            PILAT       302
   15   IBS/ Time-dependent/ Beam-beam  	      Fischer
   10   Instabilities/ Injectors (Postscript) 	      Blaskiewicz
   10   Bunch length evolution          	      Brennan
   15   Polarization overview / Polarimeter (ps)      Huang
   10   Effect of snakes / pp studies   	      Mackay
   10   Beam control for polarization   	      Ptitsyn

        POWER SUPPLIES AND RAMPING                    GANETIS     303
   25   Ramping - Hardware Issues                     Bruno
   20   Ramping - Software Issues                     van Zeijts
   20   System Fault Diagnostics                      Ganetis
   15   System Startup in March                       Sandberg
   10   Session Discussions                           Ganetis

 3:00   COFFEE
 3:30   PLENARY - PARALLEL SESSION REPORTS            SATOGATA    302
   15   Power supplies/ramping                        Ganetis
   15   High Frequency/RF                             Brennan
   15   AP Studies/Issues                             Pilat
   45   General discussion

 6:30   DINNER: Eastern Pavilion (sushi/chinese), Stony Brook

======================================================================
RHIC RETREAT 2000                              Thu Nov 16 / Fri Nov 17
DRAFT: October 31 2000                                 SUNY/StonyBrook
======================================================================
FRIDAY NOVEMBER 17 2000

 8:00	LIGHT BREAKFAST
 8:30   PLENARY - PRELIMINARY DISCUSSION              SATOGATA    302
   25   Controls                                      Morris
   25   Instrumentation                               Cameron
   25   RHIC 2001 Plans and Goals                     Trbojevic

10:00   COFFEE
10:30   PARALLEL SESSIONS

        RHIC 2001 PLANS AND GOALS                     ROSER       302
   15   Tandem intensity                              D. Steski
   15   Beyond 10^9/bunch (MS Doc)                    M. Brennan
   15   AGS extraction chitter                        W. Glenn
   15   ATR emittance measurements                    N. Tsoupas
   15   Context switching (Postscript)                K. Gardner
   15   Discussion                                    L. Ahrens

        INSTRUMENTATION                               CAMERON     305
   60   Tune Measurements / Damping                   Drees/Cameron
   30   Chromaticity Measurements                     Tepikian

        CONTROLS                                      MORRIS      311
   45   Data Acquisition, Monitoring, & Logging       Morris
   35   Fault Reporting & Recovery Procedures         D'Ottavio

12:00   LUNCH
 1:30   PARALLEL SESSIONS - CONTINUED

        RHIC 2001 PLANS AND GOALS                     TRBOJEVIC   302
   20   STAR Critique Session Summary                 B. Christie
   20   PHENIX                                        A. Franz
   20   Run 2001 Dry Run System Commissioning         D. Trbojevic
   15   Operations Planning                           P. Ingrassia
   15   Discussion

        INSTRUMENTATION                               CAMERON     305
   25   BPMs                                          Satogata/Cernig
   20   Transverse Profile                            Connolly
   20   Longitudinal Profile                          Lee

        CONTROLS                                      MORRIS      311
   45   Sequencing / Ramping / Knobbing               van Zeijts
   45   Analysis Tools: Ramp Comparison & Post Mortem Laster
  
 3:00   COFFEE
 3:30   PLENARY - PARALLEL SESSION REPORTS            SATOGATA    302
   15   Controls                                      Morris
   15   Instrumentation                               Cameron
   15   RHIC Upgrades                                 Mackay
   45   RHIC 2001 Plans and Goals: open discussion    Trbojevic

 5:00   CLOSE-OUT                                     Satogata    302

======================================================================