The Relativistic Heavy Ion Collider Run-4
Gold-Gold Operation    2003/04


[Brahms]  [Star]  [Phenix]  [Phobos]
[RHIC AGS Machine Status]   [Scheduling Physicist]   [Beam Experiments]
Integrated Au-Au Luminosity
[delivered to Phenix, in μb-1]

Total
[100GeV/u]
Total
[31GeV/u]
1368
[12-Dec to 24-Mar]
21.8
[25-Mar to 2-Apr]
[C-AD Broadcast]   [Ring Temperatures]   [Polarized Proton Operation]
[Booster/AGS/RHIC Parameters]   [Operations]   [RHIC Operations]   [Controls]   [QLI Analysis]   [Injection Stats]  
[Past RHIC Runs]   [Elogs]   [OC Elog]   [AuAu Elog]   [Shift Leaders Schedule]

Fri 04/02/04 The RHIC Run-4 gold-gold operation has ended.

Major run achievements:
- Start-up/ramp-up in 4 weeks (1 week less than planned)
- Consistently higher bunch intensities (109Au) delivered by injectors
- Time in store increased to 53% (65% at 31.2GeV/u) [Plot]
- Reliable and almost complete rebucketing
- Luminosity steering and collimator setting time reduced to 10min
- Best 7 days delivered 179 μb-1 to Phenix (20-Feb to 26-Feb)
- Set-up for 31.2GeV/u run in less than 2 days
Total delivered luminosities:
[in  μb-1 (relative to Run-2)]

  Experiment
 100GeV/u
[Plot]
31.2GeV/u
[Plot]
   Phenix
1370 (15x)
21.8
   Star
1270 (21x)
20.7
   Brahms
560 (13x)
12.2
   Phobos
540   (7x)
12.3


[Run History]  [Weekly Status]  [Start Up 100GeV/u]   [Start Up 31.2GeV/u]  
[Retreat 2004]   [Run Schedule]   [Collider Projections]   [Retreat 2003]   [Run-3]   [Run-2]   [Run-1]
Run Coordinator: Wolfram Fischer wfischer@bnl.gov 631-807-5476 (cell) 631-344-5452 (office) 631-821-2698 (home)
Deputy: Mei Bai mbai@bnl.gov 631-721-6948 (cell) 631-344-3397 (office) 631-696-1266 (home)