| The Relativistic Heavy Ion Collider Run-4 Gold-Gold Operation 2003/04 [Brahms] [Star] [Phenix] [Phobos] [RHIC AGS Machine Status] [Scheduling Physicist] [Beam Experiments] |
|
||||||
| Major
run achievements: - Start-up/ramp-up in 4 weeks (1 week less than planned) - Consistently higher bunch intensities (109Au) delivered by injectors - Time in store increased to 53% (65% at 31.2GeV/u) [Plot] - Reliable and almost complete rebucketing - Luminosity steering and collimator setting time reduced to 10min - Best 7 days delivered 179 μb-1 to Phenix (20-Feb to 26-Feb) - Set-up for 31.2GeV/u run in less than 2 days |
Total
delivered luminosities:
[in μb-1 (relative to Run-2)]
|
| [Run History] [Weekly Status] [Start Up 100GeV/u] [Start Up 31.2GeV/u] | ||||||||||||
| [Retreat 2004] [Run Schedule] [Collider Projections] [Retreat 2003] [Run-3] [Run-2] [Run-1] | ||||||||||||
|