The Relativistic Heavy Ion Collider Run-5
Copper-Copper Operation    2004/05

[Brahms]  [Star]  [Phenix]  [Phobos]  [Beam Experiments]  [RHIC Runs Overview
[RHIC AGS Machine Status]  [Scheduling Physicist]  [Machine/Detector Planning]

Integrated Cu-Cu Luminosity
[delivered to Phenix, in nb-1]

Total
[100GeV/u]

Total
[31GeV/u]

15.16
[...]

0.520
[...]

 

[C-AD Broadcast]   [Ring Temperatures]  

[Booster/AGS/RHIC Parameters]   [Operations]   [RHIC Operations]   [Controls]   [QLI Analysis]   [Injection Stats]  

[Elogs]   [OC Elog]   [CuCu Elog]   [Shift Leaders Schedule]  [Configuration Control]   [Plan of the Day]



Run-5 preparation:

·  Retreat Summary

·  Projections

·  Injector parameters

·  Run-5 parameters

·  Injectors List   Organization

Total delivered luminosities:

(from January 11, 2005)
                       [in  nb-1 ]        [in mb-1]

 

  Experiment

 100GeV/u
 

31.2GeV/u

   Phenix

15.16

520

   Star

14.99

470

   Brahms

6.15

300

   Phobos

5.67

250

 



[Run-4]    [Dry Run 1]    [Dry Run 2]   [Dry Run 3]    [Start Up Cu Injectors]    [Start Up Cu 100GeV/u

[Run Schedule]   [Run-5 History]    [Run-5 Weekly Status]   

Run Coordinator:

Fulvia Pilat

pilat@bnl.gov

7273 (BNL beeper)

631-576-5475 (cell)

631-344-3134 (office)

631-689-6274 (home)

Deputy:

Mei Bai

mbai@bnl.gov

xxxx (BNL beeper)

631-721-6948 (cell)

631-344-3397 (office)

631-696-1266 (home)

Last modified: Wed Mar 23 010:30 EDT 2005