The Relativistic Heavy Ion Collider Run-8
 
Deuteron-Gold Operation
[STAR]   [PHENIX]   [Machine/Detector Planning]  
[RHIC AGS Machine Status] [ Scheduling Physicist] [Accelerator Physics Experiments]

Max achieved this run:
E
GeV/nucleon
100
Lpeak
1028 cm-2s-1
25
Lavg
nb-1/week 40

[C-AD Broadcast]  [Ring Temperatures]  [Booster, AGS, RHIC Parameters (barp08)]  [Configuration Control]

[RHIC d-Au Elog]  [OC Elog]  [Elogs]  [RHIC Shift Leaders Schedule]  [Plan of the Day
[Dry Run Status]  [2nd Dry Run]  [Start-up Milestones]  [Start-up Schedule]  [Setup Plan]
[Run History (Oct, Nov)]  [Run History (Dec, Jan)]  [Run Chronology (Oct, Nov)]  [Run Chronology (Dec, Jan)]  [Condensed Chronology


The deuteron-gold run ended on 28 January 2008 8am.
dAu luminosity

RHIC Runs overview]  [Controls]  [Operations]  [QLI Analysis]

RHIC Run Coordinator:

Kip Gardner

cgardner@bnl.gov

631-929-0847 (home)

631-344-4537 (office)

Deputy:

Christoph Montag