User Guides | App Development | FEC Info | Hardware | AccessControls | Database | Diagnostics | Others




DOCUMENT 

CONTACT 

LAST
UPDATED 

CONTROLS SUPPORT DOCUMENTATION

buxton@bnl.gov

07/08/2003

Xilinx and Altera chips programming procedure (pdf)

altinbas@bnl.gov

8/11/08

RHIC Event System
VME modules V100, V101, V102, V103, V104, 
VME Chassis T102 AGS Delay/Decoder Transition Module 

oerter@bnl.gov

3/3/97 

V202 Timing Decoder Module(PDF)

theisen@bnl.gov 

1/17/2003 

V105/V106 RTDL Encoder/Input Modules

hartmann@bnl.gov 

2/15/96 

Real Time Data Link System
(1997 Particle Accelerator Conference Paper)

hartmann@bnl.gov 

5/30/97 

V107 

C. R. Conkling Jr  

12/06/97 

V108 RHIC Utility Modules
V109 RHIC Utility Modules 
AC Power Reset Module Specification

 

1/25/99 

V110 AGS DATACON Master Module
T110 AGS DATACON Master Transition Module 
P110 AGS DATACON Master P2 Buffer Board 
DD110 AGS DATACON Driver Assembly

 

n/a 

DATACON Master(PDF)
(Reprint from 1995 Particle Accelerator Conference)

 

1995 

V112 Specification (in MS Word)

michnoff@bnl.gov

4/18/2003 

V113 RHIC MADC Specification

michnoff@bnl.gov

7/21/95 

V113 RHIC MADC Paper
(Reprint from 1995 Particle Accelerator Conference)  

michnoff@bnl.gov

5/01/95 

V114 RHIC MADC Analog Input Module

michnoff@bnl.gov

n/a 

Power Supply Waveform Generators: 

  hartmann@bnl.gov

11/15/2004 

V117 

unassigned 

n/a 

V118 RHIC Loss Monitor Controller Module 

michnoff@bnl.gov

10/25/96 

V119 RHIC Loss Monitor Analog Module

michnoff@bnl.gov

n/a 

RHIC BEAM PERMIT SYSTEM: 

oerter@bnl.gov 
michnoff@bnl.gov 

04/14/2004 

AGS & Booster BPM controls:

buxton@bnl.gov 

12/15/2003 

V123 Beam Synchronous Encoder Module

ytian@bnl.gov 

11/7/96 

V123 Beam Synchronous Encoder Module Paper
(1999 Particle Accelerator Conference Paper) 

 

3/18/99 

SRPLL (Switched Reference Phase Lock Loop)

 

03/14/01

Switched Reference Phase Lock Loop (SRPLL)(PDF)
(2001 PAC, Chicago, IL.)

 

06/25/01

V123S  SNS Beam Synchronous Master-Draft

ytian@bnl.gov 

9/10/03

V124 Beam Synchronous Trigger Module 

hartmann@bnl.gov 

8/3/98 

V125 Beam AbortKicker Module 

oerter@bnl.gov 

3/15/99 

V126 FEB Control Module

oerter@bnl.gov 

5/19/99 

V128 General Purpose VME I/O Module Specification(PDF)

ytian@bnl.gov 

9/1/01

V132 Gauss Timeline Generator Specification(PDF)

ytian@bnl.gov 

9/1/04

V133 Function Generator (MS Word)

theisen@bnl.gov 

12/16/04

V186 Stepper motor interface module  (MS Word)

buxton@bnl.gov 

n/a 

NSRL Permit System  (MS Word)

buxton@bnl.gov 

n/a 

V191 RHIC RTDL Bus Extender 

hartmann@bnl.gov 

n/a 

V192 Booster Extraction Start Gate Module
V193 RHIC 720 Hz Module 

oerter@bnl.gov

2/27/97 

V194 TTL Pulse Fanout Module 

oerter@bnl.gov

10/11/95 

V196/V197/V198 AGS Timeline Trigger/Buffer Modules 

buxton@bnl.gov

10/2/95 

V199 RHIC Passive Load Module 

oerter@bnl.gov

2/11/97 

V210 User's Manual (PDF)

michnoff@bnl.gov 

10/25/04

V210 Test Procedure (PDF)

michnoff@bnl.gov 

10/25/04

V233 Function Generator (PDF)

ctheisen@bnl.gov 

3/19/08

V294 General Purpose I/O Module Specification(PDF)

ytian@bnl.gov 

9/1/01

V294 with Stretched Complementary Outputs(PDF)

ytian@bnl.gov 

9/10/03

D09-E2440Fanout Unit

oerter@bnl.gov

10/11/95 

16 Bit Power Supply Interface Jumper Configuration 94028650

hartmann@bnl.gov

12/20/02 

RHIC Controls Rack and Wiring Drawings 

michnoff@bnl.gov

5/13/97 

Injector Controls Equipment: Index By Building

 

06/09/2003 

Ags/Booster/Linac Rack and Wiring Drawings 

koropsak@bnl.gov

1/13/00 

RHIC Installation and Checkout 

michnoff@bnl.gov

12/4/97 

Accelerator Controls Section Drawing Index 

oerter@bnl.gov

9/25/97 

AGS, Booster, Linac Controls

buxton@bnl.gov

9/22/99 

Heavy Ion Transfer Line (HITL)

buxton@bnl.gov

10/28/2004 

Maps to find our Equipment

jappe@bnl.gov

6/12/2003 

Ags/Booster Fiber Optics 

koropsak@bnl.gov

9/29/99 

NASA Space Radiation Laboratory Rack and Wiring Drawings

buxton@bnl.gov

11/17/03

buxton@bnl.gov

11/25/03 

buxton@bnl.gov

04/01/05 

ytian@bnl.gov

04/04/07 

 

Last updated on August 11, 2008


Address your question or suggestion to Wenge Fu (fu@bnl.gov)