Task Sheets for FY07
ACCELERATOR SYSTEMS (Shiltsev)
							Last
1.1      INSTRUMENTATION (Ratti)			Update
1.1.1.1   Tune Feedback (Cameron)			8/07
1.1.1.2 Luminometer (Ratti) 9/27
1.1.1.4 Schottky (Jansson) 7/25
1.1.1.5 AC Dipole (Kopp) 6/30

1.2 COMMISSIONING (Syphers) 1.2.1.1 Beam Commissioning (Harms) 7/05
1.2.1.2 Interaction Region Commissioning (Lamm) 7/31
1.2.1.3 Hardware Commissioning (Lamm) 7/31

1.3 COLLIMATION (Markiewicz) 1.3.1.1 Cleaning Efficiency Studies (Drees) 8/15
1.3.2.1 Rotating Collimator R&D (Markiewicz) 7/03
1.3.2.2 Tertiary Collimator Study (Mokhov) 8/03
1.3.2.3 Irradiation Studies (Simos) 6/23

1.4 ACCELERATOR PHYSICS (Fischer) 1.4.1.1 Electron Cloud (Furman) 6/10
1.4.1.2 Interaction Regions & Beam-Beam (Sen) 6/10
1.4.1.3 Beam-Beam Wires (Fischer) 8/16
1.4.1.4 New initiative feasibility studies (Shiltsev) 6/01

MAGNET R&D (Kerby) 2.1 DESIGN STUDIES (Zlobin) 2.1.3.2 Inner Triplet Cryo & Heat Transfer (Rabehl) 7/05
2.1.3.3 Radiation Heat Deposition (Mokhov) 7/14
2.1.4.1 High Gradient Quad Conceptual Design (Sabbi) 6/13
2.1.4.2 Long Quad Conceptual Design (Ambrosio) 8/01
2.1.4.3 Interaction Region Magnet Study (Wanderer) 7/06
2.1.4.4 New magnet initiatives (Wanderer) 8/01

2.2 MODEL MAGNET R&D (Sabbi) 2.2.1.1 Technology Quad - Shell TQS (Caspi) 6/13
2.2.1.2 Technology Quad - Collar TQC (Bossert) 6/13
2.2.2.1 Long Quadrupole LQ (Sabbi) 6/13
2.2.2.2 High Gradient Quadrupole HQ (Sabbi) 6/13

2.3 SUPPORTING R&D (Ambrosio) 2.3.1.2 Small Magnet Fabrication & Test (Ferracin) 6/26
2.3.1.3 Radiation hard insulation R&D (Ambrosio) 9/07
2.3.2.2 Racetrack Coil Fabrication & Test (Wanderer) 6/30
2.3.3.1 Testing (Lietzke) No task sheet

2.4 MATERIALS (Ghosh)
2.4.1.1 Strand R&D (Barzi) 8/01
2.4.1.2 Cable R&D (Dietderich) 6/29
2.4.1.3 Procurement (Ghosh) 8/01

PROGRAM MANAGEMENT (Peggs) 3.1 ADMINISTRATION 3.1.1.1 Accelerator Systems (Shiltsev) 8/16
3.1.1.2 Magnet R&D (Kerby) 8/16
3.1.1.3 Programmatic Travel (Peggs) 8/16
3.1.1.4 Toohig Fellowships (Peggs) 8/16


Task Sheets for FY06 v2b

Stable FY06 budget version v2b (Oct 31, 2005) [XLS] [PDF]

1.1      INSTRUMENTATION
1.1.1.1  Tune Feedback [DOC] (Cameron)
1.1.1.2  Luminometer [DOC]  (Ratti)
1.1.1.4  Schottky [DOC] (Jansson)
1.2      COMMISSIONING
1.2.1.1  Beam Commissioning [PDF] (Harms)
1.2.1.2  Interaction Region Commissioning [DOC] (Lamm)
1.3      COLLIMATION
1.3.1.1  Cleaning Efficiency Studies [DOC] (Drees)
1.3.2.1  Rotating Collimator R&D [PDF] (Markiewicz)
1.3.2.2  Tertiary Collimator Study [DOC] (Mokhov)
1.3.2.3  Irradiation Studies [DOC] (Simos)
1.4      ACCELERATOR PHYSICS
1.4.1.1  Electron Cloud [DOC] (Furman)
1.4.1.2  Interaction Regions & Beam-Beam [DOC] (Sen)
1.4.1.3  Beam-Beam Wires [DOC] (Sen)

2.1      DESIGN STUDIES
2.1.3.2  Inner Triplet Cryo & Heat Transfer [DOC] (Rabehl)
2.1.3.3  Radiation Heat Deposition [DOC] (Mokhov)
2.1.4.1  High Gradient Quad Conceptual Design [DOC] [PDF] (Sabbi)
2.1.4.2  Long Quad Conceptual Design [DOC] (Ambrosio)
2.1.4.3  Interaction Region Magnet Study [DOC] (Gupta)
2.2      MODEL MAGNET R&D
2.2.1.1  Technology Quad TQS01 [DOC] (Caspi)
2.2.1.2  Technology Quad TQC01 [DOC] (Bossert)
2.2.1.3  Technology Quad TQS02 [DOC] (Caspi)
2.2.1.4  Technology Quad TQC02 [DOC] (Bossert)
2.2.1.5  Coil/Structure Exchange TQE01 [DOC] (Ferracin)
2.2.1.6  Technology Quad TQS03 [DOC] (Caspi)
2.2.1.7  Technology Quad TQC03 [DOC] (Bossert)
2.3      SUPPORTING R&D
2.3.1.2  Small Quad SQ02 Fabrication & Test [DOC] (Ferracin)
2.3.2.2  Racetrack Coil Fabrication & Test [DOC] (Schmalzle)
2.3.2.3  Racetrack Supporting Structure [DOC] (Ferracin)
2.3.3.1  Testing [DOC] (Feher)
2.4      MATERIALS
2.4.1.1  Strand R&D [DOC] (Barzi)
2.4.1.2  Cable R&D [DOC] (Dietderich)
2.4.1.3  Procurement [DOC] (Ghosh)

3.1      ADMINISTRATION
3.1.1.1  Accelerator Systems  (Shiltsev)
3.1.1.2  Magnet R&D  (Gourlay)
3.1.1.3  Programmatic Travel  (Peggs)
3.1.1.4  Toohig Fellowships  (Peggs)


Task Sheets for FY05+

1.1.1.1  Tune Feedback
1.1.1.2  Luminometer 
1.1.1.3  Abort Gap Monitor/Wall Current Monitor
1.2.1.1  Beam Commissioning
1.2.1.2  IR Commissioning
1.2.2.1  Electron Cloud
1.2.2.2  Interaction Regions and Beam-Beam 
1.3      Collimation
2.1.1.1  Shell & block design comparison
2.1.1.2  Shell mechanical design study
2.1.2.1  D1 Design
2.1.2.2  D1 cooling study
2.1.3.1  IR cryogenic design
2.2.1.1  Technology Quad TQ1a design, fab, test
2.2.1.2  Technology Quad TQ2a design, fab, test
2.3.1.1  Small Quad SQ-01b test
2.3.1.2  Small Quad SQ-02 fabrication & test
2.3.1.3  Sub-scale dipole test
2.4.1.1  Strand R&D
2.4.1.2  Cable R&D