First beam to Beam Dump
Success:
Beam threaded down to the beam dump.
Directory for info on the ATR
Overview
Holy Lattice (original design)
Quad strengths
Optics parameters
Coordinate systems
Global coordinate system for surveys
Local beamline coordinates
Definitions and Ack!!-ronyms
Commissioning & Vertical integration
(Limited to AGS and RHIC)
FEB extraction from AGS
Installation Report
(Database query)
Safety system
(Gates, interlocks, sweeps, ...)
SiteWideName
's (conventions and names)
Application and Controls Support
RHIC Controls support
High level application software
Call List
for ATR Systems Support (Restricted to MCR consoles.
ATR_DAILY_BULLETIN
Some rather more esoteric stuff:
Database descriptions and querries:
atr_gddb
generic definition database.
atr_cal
callibration database.
Related Topics
Brookhaven National Laboratory
AGS
RHIC Home page
RHIC Accelerator Home Page
RHIC Sextant Test
RHIC Accelerator Physics
(RAP)
Controls
RHIC Design Manual
Installation
Instrumentation
Tour
Mangled by
Waldo
MacKay
(waldo@bnl.gov)
Get a browser which understands JavaScript if you care to see the last update time.