With regard to the cryogenic test plan for the first sextant.

The following lists the items we would nominally like to measure during the 
run.  I've included the list of parasitic measurements for your convenience.

Parasitic measurements:
----------------------
 1- Process (S,R,U,H,M) heat leak measurements (delta-T) at normal flow 
    conditions.
 2- Process pressure drop measurements (M,R,U,H) during cooldown.
 3- Process pressure drop measurements (warm M) concurrent with final 
    leak check.
 4- Instrument air usage, nominal.
 5- Thermal cycle time.

Independent measurements:
------------------------
 1- Magnet process heat load measurements with recoolers isolated 
    from supply (boil-off measurements).
 2- Magnet process heat load measurements (delta-T with low flow 
    condition)
 3- Magnet loop pressure drop as a function of flow at normal 
    operating temperatures.
 4- Cooling capability at simulated full ring impedance (post sextant 
    impedance measurement).
 5- Cooling performance with a high heat load condition (warm up 
    heaters used as distributed calorimeter).

Independent measurements, 1-5 above, should take approximately 1or 2 
eigth hour shifts each to complete.  They do not need to be completed in 
a consecutive manner, but will require magnets off, and stable cryogenic 
and vacuum conditions.

Michael Iarocci
Cryogenic Section Head, RHIC Project