Setup Information and Help for CAD Accelerators:


 
Booster & AGS
ATR & Injection
RHIC
Archived Files

Booster & AGS


 

Title

Author

Last Modified

VHF Setup VanAsselt 12/11/98
AGS Extraction Setup  Ahrens/Brennan  4/5/00
EveryDayTuning Zeno, K.L.  08/24/01
J10 Dump Controls VanAsselt 9/21/01
Checking for Polarization at 200 MeV PFI  12/12/01
Instructions for taking daily paramater data for polarized protons  MacKay/Brown 01/14/02
AGS IPM Emittance and Coherence Measurements BLB & AJK  04/18/03
Starting the AGS CNI Polarimeter DAQ Application Huang/Hammons 4/3/05
Retuning for a failed gamma quad  PWS 04/10/05
Extraction Synchro problems
PWS
04/20/05
Using Scraping in the Booster to Reduce H & V and Longitudinal Emittances ZKL  05/20/05
AGS Cold Snake Instructions
D. Bruno
01/17/08
Reproducible Beam for RHIC
Zeno, K.L.
03/17/06
(Auto) Gauss Clock Calibration
Harvey, M.E.
05/10/07

ATR & injection


back to top
 
 
ATR Orbit - Model Trajectory  Satogata 3/21/00
ATR Orbit - Quad centering  Satogata 3/23/00
AGS Extraction Setup  Ahrens/Brennan 4/5/00
XY Arc Power Supply Turn On  Bruno 4/24/00
Sending Setpoints to AtR Supplies from pet  D. Bruno 02/24/07
FEB-bunch wiring diagram Venegas 12/15/00
ATR Orbit - Difference Trajectory Satogata 6/12/01 
ATR Orbit - Logging Data  Satogata 6/12/01
Measuring emitance in AtR  Sampson/Tsoupas 1/10/02
Checking chromaticity at injection  Trbojevic 1/12/02
Instructions for taking daily paramater data for polarized protons  MacKay/Brown 1/14/02
RHIC Injection  Fischer 10/7/03
Flag Profile Monitor Instructions Ferrone 2/18/05

RHIC


back to top
 
 
Tune diagram plots  MacKay 5/6/01
Gamma quads -  timing search data analysis  C. Montag  6/9/01 
Gamma quads - JumpWatch application  C. Montag 8/20/01
Correcting for tripped magnets during a store/Launch application  Luciano/Ptitsyn 9/19/01
Ion pump alarm confuguration  L. Smart 9/19/01
Ramifications of resetting the RTDL  PWS 10/30/01
RHIC Timing  MacKay 1/8/03
Uses of RHIC collimators  Fliller, Drees 5/2/03
Re-arming RF DSPs  W. Fischer 10/8/03
Lifetime in store W. Fischer 10/8/03
Manual RF synchro & cogging beams in RHIC  Hayes/Fischer 7/25/06
Using the Cogging Scope (labview) program  E. Hutchinson 12/11/03
Steering - using the lisa application  A. Drees  1/6/04
Abort kicker recovery at store  Kling 05/30/07
Collimation - using the Collimator Manager application  C. Werth/ A. Drees  1/17/05
Tune Ripple PS Setup D. Bruno  2/28/07
Gap Cleaning methods, old and new Kozak / Drees / Michnoff/Luciano 3/22/06
Global decoupling application     Decoupling with BBQ J. Beebe-Wang 04/07/06
RHIC Abort Kicker Reset  Arhrens/Marr 5/30/07
BBQ Operation  DellaPenna 01/30/08

Power Supplies/Quench Detection 

Instructions for using the RHIC QLoop  Schultheiss 1/10/02
Quench diagnostics  J. Kozak 1/5/03
Lead flow interlock response Sampson/Ganetis 12/10/03
Quench recovery  Kozak/Ganetis 4/16/04
QD FEC rebooting instructions  Kozak/Ganetis 4/16/04
Sextupole and trim quad turn on  Kozak/Ganetis/Bruno 4/16/04
Current regulator card faults Hammons 3/2/05
Bypassing a QPA Fan Fault Bruno 2/8/06
Operator instructions for RHIC snake and spin rotator power supplies  D. Bruno 05/05/06

Polarized Protons 

Operation of RHIC CNI polarimeter  O. Jinnouchi 4/29/03
Appendix to RHIC CNI polarimeter operating instructions  O. Jinnouchi 5/14/03
Changing the fill pattern  W. Fischer 10/8/03
CNI Analysis Instructions V. Schoefer 4/28/04
Polarization Measurements Using pet K. Ferrone 4/8/05
Jet Target Operating Instructions Y. Makdisi 02/19/08
Polarimeter Operation Instructions for polarControl B. Brueggert 4/14/06
AGS Tune Quad Operation for p^ P. Rosas 4/27/06


Questions or comments: contact Gregory MarrPaul Sampson, or Waldo MacKay (waldo@bnl.gov)