Plan of the Day

  1. June 25-28, 2011
  2. June 24, 2011
  3. June 23, 2011
  4. June 22, 2011
  5. June 21, 2011
  6. June 20, 2011
  7. June 17-20, 2011
  8. June 16, 2011
  9. June 15, 2011
  10. June 14, 2011
  11. Weekend June 10-13, 2011
  12. June 8, 2011
  13. June 7, 2011
  14. Weekend June 4-6, 2011
  15. June 3, 2011
  16. June 2, 2011
  17. June 1, 2011
  18. Holiday Weekend May 27-31, 2011
  19. May 26, 2011
  20. May 25, 2011
  21. May 24, 2011
  22. Weekend May 20-23, 2011
  23. May 19, 2011
  24. May 18, 2011
  25. May 17, 2011
  26. May 16, 2011
  27. Weekend May 13-16, 2011
  28. May 12, 2011
  29. May 11, 2011
  30. May 10, 2011
  31. Weekend May 6-9, 2011
  32. May 6, 2011
  33. May 5, 2011
  34. May 4, 2011
  35. May 3, 2011
  36. Weekend Apr 29-May 2, 2011
  37. Apr 28, 2011
  38. Apr 27, 2011
  39. Apr 26, 2011
  40. Apr 25, 2011
  41. Weekend Apr 22-24, 2011
  42. Apr 22, 2011
  43. Apr 21, 2011
  44. Apr 20, 2011
  45. Apr 19, 2011

June 25-28, 2011

Continue 1 hour stores; minimize turnaround time.
Injection intensity 1.7e9/bunch.  Maximum Tandem/injector intensity for all fills.

STAR low intensity run, one 2 hour store.

Physics ends 2200 Tuesday 28 June.
APEX and Power Supply ramp tests follow.
Operations end at 0600 Wednesday 29 June.
Main ring hi-pot and cryo warm-up follows.

June 24, 2011

Continue 1 hour stores; minimize turnaround time.
Injection intensity 1.7e9/bunch.  Maximum Tandem/injector intensity for all fills.
If down time arises, access for:
  1. PHENIX A/C, in IR or berm
  2. PHENIX RPC, in tunnel
  3. Blue abort kicker module inspection
  4. HLRF

June 23, 2011

Continue 1 hour stores; minimize turnaround time.
Injection intensity 1.7e9/bunch.  Maximum Tandem/injector intensity for all fills.

June 22, 2011

Try for 27 GeV Physics.  Start store lengths at 1-2 hours, at discretion of experiments at this point.
Take more drift correction data between stores, adjust functions if necessary.
Continue tuning up ATR efficiency.

June 21, 2011

Continue 27 GeV setup.
  1. Setup ramp collimation
  2. Revisit store collimation if necessary
  3. Measure drift at injection between ramps
Return to optimal Tandem setup at first available opportunity after NSRL completes their day.
Start Physics stores.

June 20, 2011

APEX 0800-1600
27 GeV setup follows.  Possible experimenter access prior to beam development.
  1. switch to ramp Au11v6
  2. 3+ hysteresis ramps.
  3. Re-establish injection
  4. ramp with feedback
  5. store setup
  6. measure and correct for drift at injection
  7. measure and correct for drift at store if need be

June 17-20, 2011

Continue Physics.  Maximum bunch intensity.

June 16, 2011

Dump store at 0900.  You may want to arrange prior stores accordingly
Machine Development starts at 0900:
Return to Physics after 2 stores with AnDY in collision.

June 15, 2011

Maintenance 0800-1600
Recover Physics

June 14, 2011

Continue 4 hour Physics stores.
Intensity goal 1.6e9/bunch.  One store with a few low intensity bunch collisions:
  1. Find a Tandem pulse width setting that gives you 25% nominal intensity in RHIC.
  2. load emitTest fill pattern in RhicInjection
  3. To fill:
    1. Take one AGS cycle, nominal intensity
    2. change chopper
    3. Take one AGS cycle, low intensity
    4. restore chopper
    5. Fill ring.
    6. Switch rings and repeat 1-5 above
    7. ramp
Possible MD: remove crossing angle at IP2.

Weekend June 10-13, 2011

Continue 4 hour Physics stores.
Intensity goal 1.6e9/bunch.  

June 8, 2011

Test store: no cooling for comparison.
At present beam intensities, we would like to see the difference cooling makes.  Ideally, we should make 2 stores as identical as possible, the only difference being the lack of stochastic cooling.
Continue 4 hour Physics stores.
Intensity goal 1.6e9/bunch.  

June 7, 2011

Continue 4 hour Physics stores.
Intensity goal 1.6e9/bunch.  

Weekend June 4-6, 2011

Continue 4 hour Physics stores.
Intensity goal 1.6e9/bunch.  

June 3, 2011

Continue 4 hour Physics stores.
Vernier scans, early in ramp.  Thursday or Friday stores.
Additional access to repair BL cooling drive.
Intensity goal 1.6e9/bunch.  

June 2, 2011

Continue 4 hour Physics stores.
Intensity goal 1.6e9/bunch.  Machine Development during day, end of physics store: beta* squeeze 2 IRs all planes.
Machine Development during day, 4 hours starting between stores: working point scan.
Vernier scans, early in ramp.  Thursday or Friday stores.
Post-maintenance, or Thursday MD test ramp activity:  no rebucketing, calibrate storage cavity voltage YS4, YS5, BS4, BS5. Brennan/Blaskiwiecz/HLRF group.

June 1, 2011

Continue 4 hour Physics stores.
Intensity goal 1.6e9/bunch.  Maintenance Day 0600-1600.
Other upcoming items:
  1. Vernier scans, early in ramp.  Thursday or Friday stores.
  2. Post-maintenance, or Thursday MD test ramp activity:  no rebucketing, calibrate storage cavity voltage YS4, YS5, BS4, BS5. Brennan/Blaskiwiecz/HLRF group.
  3. Thursday MD activity: working point scan.

Holiday Weekend May 27-31, 2011

Continue 4 hour Physics stores.
Intensity goal 1.6e9/bunch.  Not yet scheduled:
  1. Test ramp activity:  no rebucketing, calibrate storage cavity voltage YS4, YS5, BS4, BS5. Brennan/Blaskiwiecz/HLRF group.
  2. MD activity: working point scan.

May 26, 2011

Resume Physics stores, 4 hour length.
Intensity goal 1.5e9/bunch.  
MD Thursday:  working point scan with rebucketed beam
Test ramp activity:  no rebucketing, calibrate storage cavity voltage YS4, YS5, BS4, BS5. Brennan/Blaskiwiecz/HLRF group.
Test ramp activity: replay ramp to gauge effecty of BBQ on ramp emittance growth.

May 25, 2011

Continue Physics stores, 4 hour length -- to be revisited if cooling gives significant lifetime improvements.
APEX 0800-2359
Intensity goal 1.5e9/bunch.  
Test ramp activity:  no rebucketing, calibrate storage cavity voltage YS4, YS5, BS4, BS5. Brennan/Blaskiwiecz/HLRF group.
Test ramp activity: replay ramp to gauge effecty of BBQ on ramp emittance growth.

May 24, 2011

Continue Physics stores, 4 hour length -- to be revisited if cooling gives significant lifetime improvements.
Intensity goal 1.5e9/bunch.  
End of store activity: beta squeeze tests.
Test ramp activity:  no rebucketing, calibrate storage cavity voltage YS4, YS5, BS4, BS5. Brennan/Blaskiwiecz/HLRF group.
Test ramp activity: replay ramp to gauge effecty of BBq on ramp emittance growth.
MD Tuesday afternoon:  working point scan with rebucketed beam

Weekend May 20-23, 2011

Continue Physics stores, 4 hour length -- to be revisited if cooling gives significant lifetime improvements.
Intensity goal 1.5e9/bunch.  
Stochastic cooling all planes on all stores if available.
End of store activity: check yellow collimation, y5 steering.
End of store activity: beta squeeze tests.
Test ramp activity:  no rebucketing, calibrate storage cavity voltage YS4, YS5, BS4, BS5. Brennan/Blaskiwiecz/HLRF group.
Test ramp activity:  working point scan with rebucketed beam

May 19, 2011

Continue Physics stores, 4 hour length.
PHENIX 30 min access during the day for MuID shielding work.
Test ramp activity:  calibrate storage cavity voltage YS4, YS5, BS4, BS5.  Brennan/Blaskiwiecz/HLRF group.
Continue ramp and store tuning:
  1. Stochastic cooling setup on all available stores.
  2. Continue increasing injected intensity, to 1.5/bunch
  3. Yellow lifetime tuning at store.

May 18, 2011

Continue Physics stores, 4 hour length.
Maintenance 0800-1600.  Booster off at 0600.
Test ramp activity:  calibrate storage cavity voltage YS4, YS5, BS4, BS5.  Brennan/Blaskiwiecz/HLRF group.
Continue ramp and store tuning:
  1. Stochastic cooling setup on all available stores.
  2. Continue increasing injected intensity, to 1.5/bunch
  3. Yellow lifetime tuning at store.

May 17, 2011

Continue Physics stores, 4 hour length.
Machine Development ~1200-1600:
  1. At store, measure chromaticity.  Check working point.  Yellow in particular.
  2. Blue injection efficiency tuning.
    1. flatten closed orbit at kicker
    2. injection orbit 4-bump?
    3. lambertson drive?
Continue ramp and store tuning:
  1. Stochastic cooling setup on all available stores.
  2. Continue increasing injected intensity, to 1.5/bunch
  3. Yellow lifetime tuning at store.
  4. Provide more storage voltage; condition cavities when downtime allows.

May 16, 2011

Continue Physics stores, 4 hour length.
Continue ramp and store tuning:
  1. Stochastic cooling setup on all available stores.
  2. Continue increasing injected intensity, to 1.5/bunch
  3. Continue Blue injection efficiency tuning.
  4. Yellow lifetime tuning at store.
  5. Provide more storage voltage; condition cavities when downtime allows.
Offline investigations:
  1. Blue injection historical data.
  2. Longitudinal emittance growth on ramp.  Find intensity dependencies in bunch-by-bunch data.
  3. WCM jump ~2.5 sec after transition?

Weekend May 13-16, 2011

Continue Physics stores.  Store length 4 hours.
Continue ramp and store tuning:
  1. Stochastic cooling setup on all available stores.
  2. Continue increasing injected intensity, to 1.5/bunch
  3. Continue Blue injection efficiency tuning.
  4. Provide more storage voltage; condition cavities when downtime allows.

May 12, 2011

Continue Physics stores.
Continue ramp and store tuning:
  1. Stochastic cooling setup on all available stores.
  2. Increase injected intensity to 1.4/bunch
  3. Continue yellow transition efficiency tuning
  4. Continue Blue injection efficiency tuning.
  5. Provide more storage voltage; condition cavities when downtime allows.

May 11, 2011

APEX and Maintenance 0001-1600
Continue Physics stores.
Continue ramp and store tuning:
  1. Increase injected intensity to 1.4/bunch
  2. Continue yellow transition efficiency tuning
  3. Continue Blue injection efficiency tuning.

May 10, 2011

Troubleshoot YA2 cavity.
Continue Physics stores.
Continue ramp and store tuning:
  1. Increase injected intensity to 1.3/bunch
  2. Increase to 111 bunches
  3. Continue yellow transition efficiency tuning (lower chrom in gammat4 stone in 0.5 steps)

Weekend May 6-9, 2011

Physics stores, 6 hour length.
Continue ramp and store tuning:
  1. Stochastic cooling setup on all available ramps.
  2. Continue ramp transmission tuning -- chromaticity before transition, orbit after transition, losses at 175sec, etc.
  3. Increase bunch number and intensity if conditions allow.

May 6, 2011

Overnight stores for experiments.
Continue fine tuning of ramp and store:
  1. Debunching at injection.  Check cavity phasing?
  2. Continue ramp collimation setup.
  3. Transition losses -- chromaticity?
  4. Orbit after transition.
  5. Dispersive losses (mid-arc) late in ramp
  6. Check and adjust Yellow store chromaticity
  7. Check injection drift correction

May 5, 2011

Continue store setup, and fine tune ramp.
  1. Rebucketing
  2. Check store chromaticity
  3. Continue tuning for store lifetime.
  4. Stochastic cooling -- call experts for any store.
  5. Set up and run ramp collimation
  6. Store automation - cogging on ramp, rebucketing, lisa optimization, periodic SGOF at store
  7. Debunching beam at injection.  Check acceleration cavity phases (HLRF)?
  8. Work on transition losses, orbit excursions after transition
Overnight stores for experiments.  Owl shifts are on call, provided there is a store before midnight.

May 4, 2011

Maintenance begins 0600.

Resume store setup ~1700
  1. Restore beam
  2. check cogging, abort gap alignment
  3. Check YA1 operation
  4. Start rebucket setup
  5. Stochastic cooling setup
  6. Landau cavity setup
  7. Work towards 111 bunches 1.3/bunch
  8. store tune scans
  9. measure chromaticity (Yellow)
  10. measure optics

May 3, 2011

Continue ramp development:
  1. Troubleshoot YA1 RF cavity
  2. Set up ramp collimation
  3. Test RhicInjection orbit feedback corrections
  4. Wiggles ramp with Booster off (around NSRL schedule)
  5. Ramp cogging & separation bump removal, with feedback on
Then store setup:
  1. Increase bunch intensity/number up to 56
  2. Steer for collisions
  3. Gap cleaning
  4. Collimation
  5. Rebucketing?
  6. 10 Hz feedback
  7. Stochastic cooling setup
  8. Increase bunch intensity/number > 56

Weekend Apr 29-May 2, 2011

  1. Continue 30 minute stores.
  2. Continue to increase injector intensities/efficiencies.
  3. Last set of vernier scans.
  4. Run ends 0800 Monday.
  5. APEX ends 1400 Monday.
  6. 100 GeV setup begins Monday evening.

Apr 28, 2011

  1. Continue 30 minute stores.
  2. Continue to increase injector intensities/efficiencies.
  3. PHENIX zero field run at 11:00?
  4. Vernier scans if desired.

Apr 27, 2011

  1. Continue 30 minute stores.
  2. Continue to increase injector intensities/efficiencies.
  3. Examine RHIC closed orbit, injection efficiency.
  4. Vernier scans if desired.

Apr 26, 2011

  1. Continue 30 minute stores.
  2. Continue to increase injector intensities/efficiencies.

Apr 25, 2011

  1. Continue 30 min stores.
  2. Prepare for possible 1-2 hours Machine Development:
  3. Engage 10 Hz GOFB
  4. Vernier scans TBD.

Weekend Apr 22-24, 2011

  1. Work on collision setup
  2. Work on store automation
  3. Other outstanding items

Apr 22, 2011

  1. Continue beam setup

Apr 21, 2011

  1. Repair Booster B3 RF cavity.
  2. PHENIX access around 14:40 for DOE tour; requires Restricted Access and PHENIX magnet off before 13:50.
  3. Continue beam setup:

Apr 20, 2011

Access to assess and repair RF mechanical tuner on 28MHz acceleration cavities.
Reverse q7 polarities for IBS-suppression lattice, in preparation for 100 GeV ramps
Switch to Au11v3 ramp
Continue AGS setup:
Continue RHIC setup at nominal injection energy 9.8 GeV:

Apr 19, 2011

Current schedule estimates Heavy Ion beam operations starting on this day.