The Relativistic Heavy Ion Collider Run-13
 
pp2pp and 255 GeV Polarized Proton Operation

[STAR]  [PHENIX]   [Machine/Detector Planning]  
[RHIC AGS Machine Status]   [Scheduling Physicist]   [Accelerator Physics Experiments]



RHIC11
RHIC12
RHIC13
E
GeV
250
255
255
Lpeak
1032cm-2s-1
1.48
1.65
??
Lavg
pb-1/week 21 36
??
Pavg % 48 52
??
[as of 01/10/2013]

[C-AD Broadcast]  [Ring Temperatures]  [Elogs]  [OC Elog]  [PPParameters (Gardner)]  [HelionParameters (Gardner)]  [Configuration Control]  [DryRun]  [Training Presentations

RHIC
[PP Elog]  [Shift Leaders Schedule]  [Run Plan]  [Recipes]  [Plan of the Day]   [Polarimeter]  [Spin Patterns
[Speedbumps]  [Carbon CNI Analysis]  [Jet Analysis]  [Accelerator Performance Plots

AGS
[PP Elog]  [Shift Leaders Schedule]  [Run Plan]  [Helion test Plan] [Recipes]




RHIC Mode 1: 255 GeV p^

Run-13 StartUp Plan: 255 GeV

255 GeV Run Machine Parameter
No of bunches: PHENIX 109 / STAR 100
Protons/bunch: 2.0x1011
Blue Ramp working point Qx, Qy: (27.685,29.673)
Yellow Ramp working point Qx, Qy: (29.685,30.673)
Blue Store working point Qx, Qy: (27.695,29.685)
Yellow Store working point Qx, Qy: (29.695,30.685)
# of collisions 2
beta* for collisions 0.65 m @IP6& 8
beta* for IP10 (e-lens) 9 m
beta* for all other IPS 7.5 m


255 GeV Run Luminosity

RHIC Mode 2: 255 GeV pp2pp

pp2pp Mode Set-Up Plan

255 GeV Run Machine Parameter
No of bunches: 109
Protons/bunch: 1.0x1010
Blue Ramp working point Qx, Qy: (27.685,29.673)
Yellow Ramp working point Qx, Qy: (29.685,30.673)
Blue Store working point Qx, Qy: (27.695,29.685)
Yellow Store working point Qx, Qy: (29.695,30.685)
# of collisions 2
beta* for collisions 7.5 m @IP6& 8
beta* for non collisions 7.5 m

RHIC Status

[RHIC Runs overview]  [RHIC Spin]  [Controls]  [QLI Analysis]  [Operations]

RHIC 255 GeV PP Run Coordinator operations:

Vincent Schoefer

schoefer@bnl.gov

631-344-8453 (office)

RHIC 255 GeV PP Run Coordinator planning:

Vahid Ranjbar

vranjbar@bnl.gov

631-344-8218 (office)

Deputy:

Haixin Huang

huanghai@bnl.gov

631-344-5446 (office)

AGS Run Coordinator:

Haixin Huang

huanghai@bnl.gov

631-344-5446 (office)